This project entails a multifaceted approach to revamp the electrical and structural aspects of the facility. Below is an expanded outline of each task:
1. Removal of Existing Lighting and Trunking System
Dismantling of Old Fixtures: Safe removal of approximately 900 outdated light fittings and associated trunking systems, ensuring all work adheres to environmental and recycling standards for electrical waste (e.g., WEEE regulations).
Site Preparation: Clearing debris and preparing surfaces for the installation of the new systems, with minimal disruption to daily operations.
Inspection and Documentation:Post-removal inspection to identify any issues with the existing wiring and infrastructure that may need repair or upgrades before the new installation.
2. Installation of Intelligent LED Lighting System for High Bay Racking
Design and Layout: Planning a high-performance intelligent LED lighting system tailored for high-bay racking, ensuring optimal light distribution, reduced glare, and enhanced visibility at all heights.
Smart Controls: Integration of intelligent lighting controls, including motion sensors, daylight harvesting systems, and programmable settings for energy efficiency.
Energy Savings: Ensuring compliance with energy efficiency standards (e.g., BREEAM or LEED), with LEDs designed to reduce power consumption and maintenance costs.
3. Installation of Emergency Lighting and Outdoor Lamppost Lighting Emergency Lighting:
Strategic placement of emergency lighting systems to illuminate escape routes, stairwells, and high-traffic areas in compliance with BS 5266 standards.
Battery-backed systems for uninterrupted operation during power outages.
Outdoor Lamppost Lighting:
Installation of durable, weather-resistant LED lampposts to enhance outdoor safety and security.
Integration of automatic dusk-to-dawn sensors or timers for efficient operation.
4. Installation of Data and Power Infrastructure Data Network Setup:
Structured cabling for seamless data connectivity, including Category 6 or higher Ethernet cables for high-speed internet and network access.
Placement of Wi-Fi access points and Ethernet outlets to cover all key operational areas.
Power Outlets:
Strategic installation of power outlets to support administrative, operational, and logistical needs.
Segregated circuits for equipment, lighting, and data systems to enhance reliability and prevent overloads.
5. Installation of Fire Alarm System Advanced Fire Safety:
Deployment of a comprehensive fire alarm system compliant with BS 5839.
Installation of heat and smoke detectors, manual call points, and sounders throughout the premises.
Zonal configuration for precise alarm identification and integration with emergency lighting systems.
6. Installation of Fork Truck Charging Ports Dedicated Charging Infrastructure:
Design and installation of secure, high-capacity charging ports for forklifts, ensuring adequate spacing and accessibility in line with operational requirements.
Implementation of protective measures such as surge protection, cable management, and safety signage.
Load calculations and dedicated circuits to prevent interference with other electrical systems.
7. Main Contractor for Building and Plumbing Works for New Toilet Blocks Structural Modifications:
Coordination of demolition and construction work to build modern toilet blocks.
Implementation of plumbing systems, including water supply, drainage, and sanitary fixtures.
Compliance with building regulations, including accessibility standards (e.g., DDA compliance).
Electrical Integration: Installation of lighting, ventilation, and power outlets in the toilet blocks as part of the electrical fit-out.
8. Electrical Installation Condition Report (EICR) Thorough Inspection:
Detailed examination of all existing electrical systems to ensure safety and compliance with the latest regulations (BS 7671: IET Wiring Regulations).
Identification of potential hazards, such as damaged cables, overloaded circuits, or outdated components.
Certification and Recommendations:
Provision of a formal EICR document highlighting the condition of the installation, any non-compliance issues, and recommendations for remedial action
This expanded scope of works ensures a seamless transformation of the facility, prioritizing energy efficiency, safety, and operational effectiveness while adhering to all relevant regulatory standards.
Removal of existing Sub mains.
Installation of two 400amp sub main panel boards
Removal of existing hi bay lighting system
Installation of new intelligent LED lighting system for production area
Installation of emergence light and outside lighting
Installation of Data and power
Fiber optic cable installation
Installation of CCTV system
Installation of production line control panels, cables, motors, sensors........
After a major Fire the whole factory was refurbished with Styles Electrical Ltd carrying out a Complete electrical installation of recycling plant in Hirwaun Ind Est. This included the complete strip out of all containment and cables. Then the reinstatement of new containment SWA supply cables, distribution boards, Power, lighting, data, door access and fire alarm systems.
Complete electrical fit-out of factory offices
New distribution boards, Power, lighting, data and air-condition supplies
Fiber optic cable installation
Installation of new LED lighting system throughout factory
Lamp-post LED lighting replacements
Reactive Call out
The complete electrical fit-out for the brand-new MOD Cadets Centre encompasses a comprehensive range of systems to ensure functionality, safety, and compliance with modern standards. Key components of the fit-out include: Power, LED lighting inside and outside, 3 compartment dado trunking, data, fire alarm, intruder alarm.
This tailored fit-out ensures that the MOD Cadets Centre is equipped with cutting-edge technology, reliable systems, and safety features to support its mission and activities effectively.